霓虹V5:福娃自然风冷1周达到灌水冷却2年的效果日本核电站分布图
日本正式宣布内胆(压力壳)没有破掉紐約時報:GE設計的冷卻系統有缺陷
造谣的或者辟谣的都看过来,日本核事故更新 (转载)Japan braces for potential radiation catastrophe
No2 reactor 也快顶不住了ZZReuters要往4号投放硼酸了
搞了半天,原来是GE的最初设计有大问题,结果害惨小日本China Concrete Pumper Gets Into Nuclear Effort (转载)
Ocean Spill Feared as Toxic Water Rises; Plutonium Found in SoilNHK NEWS(3/26):东电现在宣布被迫排水zz
小鬼子核电站又喷核蒸汽了,美西的做好准备喽2号炉的积水放射性已经是正常的10 million 倍了ZZ
NHK TEPCO forced to change strategy at plantNHK 3/27 13:44 新闻
相关话题的讨论汇总
话题: japanese话题: iaea话题: read话题: fukushima
进入Military版参与讨论
1 (共1页)
h******k
发帖数: 13418
1
Japan Earthquake Update (15 March 2011, 03:35 CET)
Japanese authorities yesterday reported to the IAEA at 21:05 CET that the
reactors Units 1, 2 and 3 of the Fukushima Daini nuclear power plant are in
cold shutdown status. This means that the pressure of the water coolant is
at around atmospheric level and the temperature is below 100 degrees Celsius
. Under these conditions, the reactors are considered to be safely under
control.
Japanese authorities have also informed the IAEA that teams of experts from
Tokyo Electric Power Company (TEPCO), the plant´s operator, are working
to restore cooling in the reactor Unit 4 and bring it to cold shutdown.
The IAEA continues to liaise with the Japanese authorities and is monitoring
the situation as it evolves.
R*N
发帖数: 2173
2
Fukushima Daini 是福岛二号
现在麻烦的是福岛一号Fukushima Daiich 跟这段没关系

in
Celsius
from
working
monitoring

【在 h******k 的大作中提到】
: Japan Earthquake Update (15 March 2011, 03:35 CET)
: Japanese authorities yesterday reported to the IAEA at 21:05 CET that the
: reactors Units 1, 2 and 3 of the Fukushima Daini nuclear power plant are in
: cold shutdown status. This means that the pressure of the water coolant is
: at around atmospheric level and the temperature is below 100 degrees Celsius
: . Under these conditions, the reactors are considered to be safely under
: control.
: Japanese authorities have also informed the IAEA that teams of experts from
: Tokyo Electric Power Company (TEPCO), the plant´s operator, are working
: to restore cooling in the reactor Unit 4 and bring it to cold shutdown.

c*********k
发帖数: 4747
3
赞看得仔细...

【在 R*N 的大作中提到】
: Fukushima Daini 是福岛二号
: 现在麻烦的是福岛一号Fukushima Daiich 跟这段没关系
:
: in
: Celsius
: from
: working
: monitoring

h******k
发帖数: 13418
4
yeah, the worst is unit 2 in Fukushima Daiich.

【在 R*N 的大作中提到】
: Fukushima Daini 是福岛二号
: 现在麻烦的是福岛一号Fukushima Daiich 跟这段没关系
:
: in
: Celsius
: from
: working
: monitoring

d*****l
发帖数: 8441
5
Daini是第二吧。

in
Celsius
from
working

【在 h******k 的大作中提到】
: Japan Earthquake Update (15 March 2011, 03:35 CET)
: Japanese authorities yesterday reported to the IAEA at 21:05 CET that the
: reactors Units 1, 2 and 3 of the Fukushima Daini nuclear power plant are in
: cold shutdown status. This means that the pressure of the water coolant is
: at around atmospheric level and the temperature is below 100 degrees Celsius
: . Under these conditions, the reactors are considered to be safely under
: control.
: Japanese authorities have also informed the IAEA that teams of experts from
: Tokyo Electric Power Company (TEPCO), the plant´s operator, are working
: to restore cooling in the reactor Unit 4 and bring it to cold shutdown.

1 (共1页)
进入Military版参与讨论
相关主题
NHK 3/27 13:44 新闻搞了半天,原来是GE的最初设计有大问题,结果害惨小日本
60000 millisieverts per hour?!!!Ocean Spill Feared as Toxic Water Rises; Plutonium Found in Soil
福岛第一核电站土壤样本中检出微量放射性钚小鬼子核电站又喷核蒸汽了,美西的做好准备喽
Japan on ’maximum alert’ over nuclear crisisNHK TEPCO forced to change strategy at plant
霓虹V5:福娃自然风冷1周达到灌水冷却2年的效果日本核电站分布图
日本正式宣布内胆(压力壳)没有破掉紐約時報:GE設計的冷卻系統有缺陷
造谣的或者辟谣的都看过来,日本核事故更新 (转载)Japan braces for potential radiation catastrophe
No2 reactor 也快顶不住了ZZReuters要往4号投放硼酸了
相关话题的讨论汇总
话题: japanese话题: iaea话题: read话题: fukushima