o****n 发帖数: 9475 | 3 http://www.sandiego.gov/cip/projectinfo/featuredprojects/tedwil
Ted Williams Parkway Pedestrian Bridge at Shoal Creek Drive Project
Background
Ted Williams Parkway, between I-15 and Highland Ranch Road, is a 6-lane
primary arterial with an average daily traffic volume of over 25,000 trips.
The posted speed is 55 mph and a reduced speed of 25 mph near Shoal Creek
Elementary School. The proposed pedestrian bridge would facilitate crossing
of the intersection, especially by children attending the adjacent Shoal
Creek Elementary School near the southeast corner of the Ted Williams/Shoal
Creek intersection. Many school children living in the surrounding
neighborhood currently cross Ted Williams Parkway twice each day on their
way to and from this school. Several accidents have occurred, prompting
community concerns and vehicle congestion in the area due to parents driving
their children to school rather than allowing them to cross at this
intersection. The proposed pedestrian bridge would address the community
concerns and provide an alternative for the school children and other
pedestrians and bicyclists to cross Ted Williams Parkway.
Description
The proposed project consists of constructing a pedestrian bridge over Ted
Williams Parkway, a six-lane arterial road at Shoal Creek Drive in Carmel
Mountain Ranch for pedestrians and bicyclists. The bridge will replace the
at-grade crossings on Ted Williams Parkway.
Benefits
Provide an alternative for the community to cross Ted Williams Parkway at
Shoal Creek Drive and access the elementary school
Reduce school-related vehicle congestion
Cost
The project estimate is $4,500,000. The current funds allocated to the
project are approximately $2,020,000 in federal funds, and $2,480,000 of
local Transnet funds.
Construction Schedule
Construction start is scheduled for April 2013. Project completion is
estimated for February 2014.
【在 o****n 的大作中提到】![](/moin_static193/solenoid/img/up.png) : 今天路过看到的
|
o****n 发帖数: 9475 | 4 当时等红灯,我揉着眼睛数了好几遍:)
【在 e*********u 的大作中提到】![](/moin_static193/solenoid/img/up.png) : 不算贵吧?要是4424修了一个咱也不敢走不是?
|
b**********y 发帖数: 504 | 5 纳税人的钱就是这么被挥霍掉的
【在 o****n 的大作中提到】![](/moin_static193/solenoid/img/up.png) : 今天路过看到的
|
b****u 发帖数: 1654 | 6 前两天看报纸说,poway 路口那个camera,poway city 一年收了5000多个ticket,但是
还不够成本,所以摘掉了,现在打算换另一个公司的,现在government正在讨论~
funny吗?我朋友去年在那个路口被照下来,400多罚款,5000多个罚单是200多万呢~
养一个摄像头还不够...干脆派个人去看着算了~ |
o****n 发帖数: 9475 | 7 修桥是好事,只是没想到这么贵
【在 b**********y 的大作中提到】![](/moin_static193/solenoid/img/up.png) : 纳税人的钱就是这么被挥霍掉的
|
O***n 发帖数: 13127 | 8 我们小区游泳池周围的台阶resurface一下还要1万多呢。甭说你那桥了
见怪不怪。多熟悉了就麻木了
【在 o****n 的大作中提到】![](/moin_static193/solenoid/img/up.png) : 修桥是好事,只是没想到这么贵
|
a***s 发帖数: 5417 | 9 还真有人走那么远去上学?
.
crossing
Shoal
【在 o****n 的大作中提到】![](/moin_static193/solenoid/img/up.png) : http://www.sandiego.gov/cip/projectinfo/featuredprojects/tedwil : Ted Williams Parkway Pedestrian Bridge at Shoal Creek Drive Project : Background : Ted Williams Parkway, between I-15 and Highland Ranch Road, is a 6-lane : primary arterial with an average daily traffic volume of over 25,000 trips. : The posted speed is 55 mph and a reduced speed of 25 mph near Shoal Creek : Elementary School. The proposed pedestrian bridge would facilitate crossing : of the intersection, especially by children attending the adjacent Shoal : Creek Elementary School near the southeast corner of the Ted Williams/Shoal : Creek intersection. Many school children living in the surrounding
|
d**********t 发帖数: 1821 | 10 这有啥 昨天早上C M 附近一个小车祸 看起来车都没啥事的 来了5辆警车在周围闪灯
除了一个小警指挥交通 其他十个人在路边聊天。 |
p********r 发帖数: 1980 | 11 四百万很便宜吧,还是城市里.
荒郊野外修宽点路都要三个亿呢. http://www.lsa-assoc.com/project-descriptions/202-i-15-i-215-interchange
所以说加州还要修什么高速铁路就是痴人说梦.
【在 o****n 的大作中提到】![](/moin_static193/solenoid/img/up.png) : 今天路过看到的
|