z****e 发帖数: 555 | 1 Should final walk through be scheduled on the closing date, or a day before?
I feel it is better to be a day before closing. If there is any problem
during final walk through, we can negotiate with the seller and negotiate
takes time.
What do you think?
Thanks, |
m********s 发帖数: 55301 | 2 无所谓。
但一定要求是空房子。
这样才能检查损坏情况。
before?
【在 z****e 的大作中提到】 : Should final walk through be scheduled on the closing date, or a day before? : I feel it is better to be a day before closing. If there is any problem : during final walk through, we can negotiate with the seller and negotiate : takes time. : What do you think? : Thanks,
|
z****e 发帖数: 555 | 3 Googled, seems it is fine to do final walk through on the closing date
Thank you, |
x******0 发帖数: 1025 | 4 我们新房子,是提早一个礼拜。然后让他们都修掉再close
如果你不是新房子我也不知道了 |
Q***N 发帖数: 2972 | 5 湾区一般提前3-5天,如果Seller没有按合同修理,或者房子在进入合同后有损坏(房
子不是签合同时相同的Condition)。你可以通知对方和Escrow联系,让对方在Closing
前解决,否则由Escrow Withhold一部分钱,一直到解决问题为止。
before?
【在 z****e 的大作中提到】 : Should final walk through be scheduled on the closing date, or a day before? : I feel it is better to be a day before closing. If there is any problem : during final walk through, we can negotiate with the seller and negotiate : takes time. : What do you think? : Thanks,
|
m********s 发帖数: 55301 | 6 你新房子还有2年保修呢。
我们新房子,是提早一个礼拜。然后让他们都修掉再close如果你不是新房子我也不知
道了
【在 x******0 的大作中提到】 : 我们新房子,是提早一个礼拜。然后让他们都修掉再close : 如果你不是新房子我也不知道了
|
z****e 发帖数: 555 | 7 The only thing they fixed is the basement electrical panel. They showed me
the receipt and I believe them. They also contributed some money for the
things they did not fix.
The only thing I need to check is if the condition of the house is the same
as when we did the inspection. Their kids are all grown up and moved out of
the house. I think it is safe to walk through on the closing date. |